← Electrocon
🔌
EV Charging
Home, society, workplace and fleet charging — installed, operated and maintained, on capex or opex.
What it is
Individual and mass charging for residential and commercial buildings, with installation, operation and maintenance, on a capex or an opex model. Including a fixed charging point in a parking slot for an electric scooter, so the battery does not have to come off and go upstairs.
What it is made of
- Rapid
- 50% in about 30 minutes — high-power DC or AC, the charging-station class
- Fast
- 100% in 3 to 6 hours — Type-2 AC, the car park and supermarket class
- Slow
- 100% in 8 to 12 hours — the commonest, for a car parked all night
- Connectors
- AC for slow, DC for fast, including CCS sockets
How Electrocon runs it
- 1Work out the load the building can actually give you
- 2Pick the charger class to match how long the car is parked
- 3Install, and take on the operation and maintenance
- 4Bill it through capex or opex, whichever the society votes for
Written for apartments, housing societies, community centres, offices, malls, restaurants and fleets.



